300 mm
600 mm
fig. 48 - Minimum spaces
The room must also be:
• Equipped with adequate water and electricity supply lines;
• Prearranged for the condensation water discharge connec-
tion;
• Prearranged with adequate water drains in case of boil-
er damage or safety valve intervention or the breakage of
pipes/connections;
• Equipped with possible containment systems in case of se-
rious water leakage;
• Sufficiently illuminated (where required);
• Protected from frost and keep dry.
170
EN
8.5
To fix the product to the floor, apply the supplied brackets as
shown in fig. 49.
600 mm
Then, secure the unit to the floor with the help of suitable plugs,
which are not supplied, as shown in fig. 50.
cod. 3540000420 - Rev. 03 - 09/2023
EGEA TECH
FLOOR FIXING
fig. 49- Fixing the brackets
fig. 50- Fixing to the floor
200 HT - 260 HT