Installing the unit
6. Installing the unit
Check that there is no condensation inside the packaging. If there are signs of condensation, the unit must not be
installed until you are sure it is completely dry.
CAUTION
All installation operations must comply with current regulations.
All operations involving moving heavy weights must be carried out using the required mechanical means (crane,
hoist, etc.).
6.1. General requirements for installation
•
The environment of the unit must be appropriate and meet the guidelines described in chapter
Preparation for installing the
compatible with the unit and comply with the applicable legislation.
•
The ventilation and workspace must be suitable for maintenance tasks according to the applicable
regulations in force.
•
The external connection devices, which must be suitable and sufficiently close as set forth in current
regulations.
•
The feed cables must be of the appropriate gage for the maximum current.
•
Special care must be taken to ensure that there are no external elements near the air inlets and outlets
that obstruct proper cooling of the unit, respecting the distances indicated in section
6.2. Attaching the unit to the wall
CAUTION
These inverters can be mounted directly on the wall or using an assembly bracket. The wall or structure on
which the inverter is installed must be capable of supporting its weight.
These units have a system for securing them to the wall using a plate. The steps for fixing the unit properly are as
follows. The weight of the unit must be taken into account.
ACL2011IQM01_ - Installation and Operation Manual
unit". Additionally, the parts used in the rest of the installation must be
Ingeteam
"5.
"5.1.
Environment".
EN
ES
FR
IT
PT
23