Ingeteam
5.
Bolt the two side fastenings, applying the torques indicated.
Tightening torque
6.
Check that the unit properly secured.
Once the unit has been installed correctly, the connection process will begin.
Connect in the following order:
1.
External ground protection connection.
2.
Communications connection.
3.
AC connection.
4.
DC connection.
CAUTION
It is mandatory to follow the order described above. Do not supply power until all the connections have been
completed.
26
IS 3TL
IS 6TL M2
1.2 Nm
3 Nm
ACL2011IQM01_ - Installation and Operation Manual
Installing the unit