11. First connection to the electricity grid
This chapter details the process for the inverter's first connection to the grid.
As this inverter is powered from the AC part, it continues to have active communications. Thus, for example, a self-
consumption installation may continue to be monitored in the absence of DC energy.
11.1. Unit inspection
You must check the correct condition of the installation before start-up.
Each installation is different, depending on its characteristics, the country in which it is located or other special
conditions which may apply. In all cases, before starting up, it is necessary to ensure that the installation complies
with the applicable legislation and regulations and that at least the part to be started up is complete.
11.1.1. Inspection
Before inverter's first connection to the grid, you must carry out a general inspection involving mainly:
Wiring inspection
Check that the cables are correctly joined to their connectors.
Check that these cables are in a good condition and that there are no hazards in their environment which
damage them, such as sources of intense heat, objects which could cut them or arrangements which put
them at risk of impacts or pulling.
Check the polarities of the DC and AC cables.
Review the unit's fastening
Check that the unit is secured firmly and is not at risk of falling.
11.1.2. Hermetic sealing of the unit
Ensure during installation operations that the unit's level of sealing has not been altered during connection of the
unit.
Check the correct adjustment of the connectors and that any cable grommets are well sealed.
11.2. Initial connection and configuration
INFO
To manage the inverter from a smartphone or tablet, you need to install the INGECON SUN Monitor app,
available on Apple Store and Play Store.
https://apps.apple.com/br/app/ingecon-sun-monitor/
id1434881715
Thanks to the web user interface, the inverter can be configured in a simple and efficient manner using a computer
or smartphone.
By default the inverter acts as a Wi-Fi access point, generating a SoftAP network with an SSID similar to
Ingeteam_1GMxxxxxxAxx_MMMM. By default, this network is protected with the password ingeconsun.
Follow the instructions below to establish a local connection with the inverter and configure it:
40
First connection to the electricity grid
https://play.google.com/store/apps/details?id=com.
ingeteam.ingecon.sunmonitor
ACL2011IQM01_ - Installation and Operation Manual