D1:
.39 in.
PE: n=1x
L1, L2, L3, N: n=2x
E1, F1:
.39 in.
Feed all conductors through the
1
large ferrite and position approx.
0.39 in. (10 mm) before the end of
the sheathing.
Feed the PE conductor through
2
the ferrite one more time.
Run small ferrite to the PE con-
3
ductor and position approx. 0.2 in.
(5 mm) in front of the large ferrite.
Feed the PE conductor through
4
the small ferrite a further 2 times.
Feed a conductor through the
5
large ferrite 2 times.
PE: n=2x
.2 in.
Feed the other conductors through
1
the large ferrite 2 times as well.
-
.79 in.
Bundle the conductor loops
2
around the large ferrite with one of
the enclosed cable ties as shown in
the figure.
Secure another cable tie approx.
3
0.79 in. (20 mm) after the large fer-
rite.
Feed all conductors through the 2
1
large ferrites and connect approx.
0.39 in. (10 mm) before the end of
the sheathing.
Run small ferrite to the PE con-
2
ductor and position approx. 0.2 in.
(5 mm) in front of the large ferrite.
Feed the PE conductor through
3
the small ferrite a further 2 times.
Then feed a conductor once
4
through the large ferrites.
PE: n=2x
.2 in.
Wrap the conductors as tightly
as possible around the ferrite.