21
Position recovery mode
After a mains power outage or after mechanically releasing the gate, if the gate is not completely open or completely
closed the next time a command is received, the control initiates a position recovery procedure:
• The gate starts a low speed manoeuvre.
•
• The control unit recovers the installation data during this procedure. Warning! During this procedure, do not use any
controls until one of the two limit switches is reached.
• Activating one of the two limit switches immediately reacquires the position.
When the control unit receives a command signal after a power failure or after the motor has been mechanically
released, if the gate is completely open or completely closed, it initiates a position recovery procedure to precisely
determine the exact position of the gate.
or/
. Arrival on the opposite limit switch takes place at reduced speed, which is automatically set (regardless of the
settings of the parameters
reduced speed (regardless of the settings of parameters
For BG30/1400/R motors only. If the control unit detects that the gate has been moved manually by more than 3 cm
from the initial position, it initiates a position recovery procedure.
22
Initial testing
The installer is required to measure impact forces and select on the control unit the appropriate speed and torque values
Make sure that the provisions in Chapter 1 "GENERIC WARNINGS are observed.
• Turn on the power supply.
• Check that all connected controls are working correctly.
• Check that the release handle works correctly. The message
• Check travel and deceleration.
• Check if the impact forces are compliant with the EN 12453 and EN 12445 standards.
• Check that the safety devices are activated correctly.
• If the battery kit is installed, disconnect from mains and check that the batteries are working.
• Disconnect from mains power and disconnect the batteries (if used), then reconnect. Starting with the gate stopped in an
intermediate position, check that the position recovery procedure is completed correctly for both the open and closed positions.
• Check that the limit switches are set correctly and function correctly. If necessary, adjust the motor installation
position.
• Check that there is a gap of at least 2-3 cm between the gate and the mechanical stop at the end of the manoeuvre.
23
Start-up
contain the wiring diagram, the drawing and the photo of the system, the risk analysis and the solutions adopted, the
manufacturer's declaration of conformity for all connected devices, the instructions manual of each device and / or
accessory and the system's maintenance plan.
Apply a plate indicating the automation system data on the motorised door or gate, the name of the person in charge
of the start-up, the serial number and the year of construction, as well as the CE mark.
Apply a plate and / or label with the indications for the operations required to manually unlock the system.
Draw up and provide the end user with the declaration of conformity, instructions and warnings for use and the
maintenance plan.
Make sure that the end user has understood the correct automatic, manual or emergency operation of the system.
Inform the end user about the dangers and risks that may be present.
24
Maintenance
Perform scheduled maintenance every 6 months.
Check cleanliness and function.
If the unit contains dirt, moisture, insects or other foreign matter, disconnect from mains power and clean the board
and the housing.
Repeat the initial installation test procedure after cleaning.
If any corrosion is found on the printed circuit board, evaluate if it is necessary to replace the board itself.
Check that the battery is in good working order.
80
,
and
), recovering the position control with maximum accuracy.
,
and
), to restore position control with absolute precision.
and/