KICK AXLE AND SHIFT SHAFT
2
1
4 - 81
EC4B5111
Stopper lever
1. Install:
Torsion spring 1
G
Stopper lever 2
G
Bolt (stopper lever) 3
G
10 Nm (1.0 m · kg, 7.2 ft · lb)
NOTE:
Align the stopper lever roller with the slot on
segment.
Shift guide and shift lever assembly
1. Install:
Spring 1
G
Pawl pin 2
G
Pawl 3
G
To shift lever 4.
NOTE:
Apply the engine oil on the springs, pawl pins
and pawls.
2. Install:
Shift lever assembly 1
G
To shift guide 2.
3. Install:
Shift lever assembly 1
G
Shift guide 2
G
NOTE:
The shift lever assembly is installed at the
G
same time as the shift guide.
Apply the engine oil on the bolt (segment)
G
shaft.
ENG