Tabla de contenido

Publicidad

EN

6. OPTIONS

The mounting of the (+) battery cable and (-) earth cable
can be speeded up with the help of following options :
6.1 S071
power and earth connection via
Cannon plugs
needs to be prepared accordingly)
6.2 S065.10 (or .18)
10 or 18 m of (+) battery cable is
+ S065.PREP
prewired in the power pack of the
HTL
6.3 S065.10D (or .18)
2x 10 or 18 m of (+) battery cable
+ S065.D.PREP
and (-) earth cable are prewired in
the power pack of the HTL
6.4 S040.F
Quick-fit battery box for the HTL
frame
6.4 S040.F
Quick-fit battery box for the HTL
+ S040.PREP
frame;
(+) battery cable and (-) earth cable
are routed in the battery box
6.5 S040.M
Slider lifts: battery box premounted
on the sliding tubes
6.5 S040.M
Slider lifts: battery box premounted
+ S040.PREP
on the sliding tubes;
(+) battery cable and (-) earth cable
are routed in the battery box
Fig. 6.6 summarizes how the (+) battery cable and (-)
earth cable are mounted in standard configuration, and
with each of the options above [See Fig. 6.6]
In case of doubt, please don't hesitate to contact the nati-
onal Dhollandia agent.
DHOLLANDIA
EJ.
(the vehicle chassis
!
6.1
! !
6.2
6.4
23
1 !
6.3
6.3
1 !
6.5

Publicidad

Tabla de contenido
loading

Tabla de contenido