Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 61
6. Place the unit in the location where it is to be installed.

3.1.2 Power Rack+

The process for unpacking the unit is described below:
CHLORIDE
POWER PROTECTION
Uninterruptible Power System
Alimentations Sans Coupure
750
B A S I C
G . I s o l
Unterbrechungsfreie
1 0 0 0
Stromversorgung
Sistema Statico di Continuita
1 5 0 0
B A T T E R Y P A C K
24 V
36 V
48 V
w w w . c h l o r i d e p o w e r . c o m
3) Remove the bag with the additional UPS components.
CHLORIDE
POWER PROTECTION
Uninterruptible Power System
Alimentations Sans Coupure
750
BASIC
G.Isol
Unterbrechungsfreie
1000
Stromversorgung
Sistema Statico di Continuita
1500
BATTERY PACK
24 V
36 V
48 V
www.chloridepower.com
945016.066
1) Prepare a clear surface for unpacking the unit.
2) Cut the packing strips and open the top of the box (Note: Be
careful not to damage the unit when cutting the strips).
4) Remove the cardboard pac-
kaging by pulling upward.
5) Remove the base.
6) Place the unit in the location where it is to be installed.
Operating Manual
C H L O R I D E
P O W E R P R O T E C T I O N
U n i n t e r r u p t i b l e P o w e r S y s t e m
A l i m e n t a t i o n s S a n s C o u p u r e
7 5 0
BASIC
G.Isol
U n t e r b r e c h u n g s f r e i e
S t r o m v e r s o r g u n g
1000
S i s t e m a S t a t i c o d i C o n t i n u i t a
1500
BATTERY PACK
24 V
36 V
48 V
w w w . c h l o r i d e p o w e r . c o m
UK
19

Publicidad

Tabla de contenido
loading

Productos relacionados para Chloride Power Protection POWER LAN+ 750

Tabla de contenido