Descargar Imprimir esta página

Corghi EM9980 Manual De Uso página 65

Ocultar thumbs Ver también para EM9980:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

-
the radial run-out of the rim (1st harmonic);
-
the radial run-out of the rim peak-to-peak;
-
the radial run-out of the tyre (1st harmonic);
-
the radial run-out of the tyre peak-to-peak;
-
the wave forms show the progress of the wheel
runout.
If a rim is mounted, the following icons are di-
splayed at the end of the spin indicating:-
the radial run-out of the inner tyre bead (1
harmonic);
-
the radial run-out of the inner tyre bead (peak-
peak);
EM9980 - Operator's manual
-
the radial run-out of the outer tyre bead (1
harmonic);
-
the radial run-out of the outer tyre bead
(peak-peak);
-
the lateral run-out of the rim (1
-
the lateral run-out of the rim (peak-to-peak).
Note: The vertical mobile bar that appears in
st
the graphs shows the vertical axis at 12 o'clock.
IMPORTANT: If present, all the adhesive
weights fixed to the inner surface of the
rim and arranged along the laser sensor
scanning area must be removed before
determining the runout measurement cycle.
If a wheel assembly is mounted where geometric
deformation has been found in both the rim and
tyre, the effects of this on the wheel assembly may
be minimised by compensating the deformation
of the rim with the deformation of the tyre.
Notification of Geometric matching is given with
an end of measurement cycle message with one
of the following indications:
-
Matching not recommended
st
harmonic);
st
UK
65

Publicidad

loading