Commissioning; Changing The Assembly Location; Selecting The Anchors - Nussbaum POWER LIFT HF 4600 Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

8.3

Commissioning

i
Before commissioning, a single safety inspection
must be done (use the Single Safety Inspection
form).
If the lift set up is done by a specialist (factory
trained assembler) then he can also do the safety
inspection. If the set up is done by the operating
company then a specialist must be tasked with the
safety inspection.
The specialist confirms seamless operation of the lift
on the set up protocol for single safety inspection
and releases the lift for use.
i
After commissioning please complete the assem-
bly protocol and send to the manufacturer im-
mediately.
8.4

Changing the assembly location

To change the assembly location the pre-conditions
must be met according to the assembly guidelines.
Use new anchors. The old anchors are no longer fit
!
for purpose.
8.5

Selecting the anchors

Concrete quality min C20/25 normal reinforced
Rights reserved to make changes!
OPI-POWER LIFT HF 4600-HYMAX HF 4600-V2.3-DE-EN-FR-ES-IT
Hilti injection anchor
Concrete floor
Anchor
Drill depth (mm)
Minimum anchoring
depth (mm)
Component thickness
(mm)
Bore diameter (mm)
Attachment thickness
(mm)
Torque (Nm)
Total length (mm)
Thread
Part count
Follow the assembly instructions of the anchor
manufacturer. Use longer anchors for floor cover-
ings (screed / tiles).
Similar value injection anchors from other man-
ufacturers (with permission) in compliance with
their specifications.
HF 4600
without floor
cover
HIT-V-5.8
M16x200
Art.no. 956437
h
144
0
h
144
ef
h
min. 180
min
d
18
0
t
23
fix
T
80
inst
I
200
M
16
a
4
b
8
c
10
d
12
e
14
f
16
g
28
77

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hymax hf 4600

Tabla de contenido