SYMBOLS
�
Caution! Refer to the explanation in this manual.
WARNING. HAZARDOUS VOLTAGE.
Risk of electric shock.
Consult user documentation.
T
The equipment is protected by double insulation or reinforced insulation.
J
Earthing (grounding) terminal.
Reference, please pay utmost attention.
Conformity symbol, confirms compliance with the applicable European directives. The requirements
�
of the Low Voltage Directive with the relevant regulations Standards are also fulfilled.
=
Symbol for marking of electrical and electronic equipment (WEEE Directive).
SAFETY INFORMATION
Tests of charging stations should only be carried out by properly trained and competent persons!
Please carefully read the safety information before using the EVA-500 test adapter.
�WARNING
To avoid the possibility of electric shock or personal injury:
• The user manual contains information and references necessary for safe operation and maintenance of the
adapter. Prior to using the adapter, thoroughly read the user manual and comply with it in all sections.
• If the equipment is used in a manner not specified by the manufacturer, the protection provided by the
equipment may be impaired.
• Failure to read the user manual or to comply with the warnings and references contained herein can result
in serious bodily injury or equipment damage.
INTRODUCTION
You have acquired a high-quality test adapter manufactured by BEHA-AMPROBE, which will enable you to
perform repeatable measurements for a very long period of time.
The EV-500 Series is designed to test function and safety of charging stations mode 3 for AC charging. This
adapter allows you to conduct tests in combination with appropriate test instruments like Installation Tester
and/or Scope Meters (oscilloscope). With this adapter, charging stations can be tested in accordance with IEC/
EN 61851-1 and IEC/HD 60364-7-722.
AVAILABLE MEASUREMENTS AND PRODUCT DESCRIPTION
• PE Pre-Test (potential presence of dangerous voltage at PE terminal by mistake) – touch electrode and LED lamp.
• Phase indicator (presence of all three phase voltages measured to N) – three LED lamps.
• PP State simulation (open, 13 A, 20 A, 32 A, 63 A) – rotary switch.
• CP State simulation (A, B, C
• CP Error "E" simulation (CP signal short-circuited to PE) – push button.
• PE Error (Earth Fault) simulation (interruption of PE conductor) – push button.
• Measurements on live conductors (L1, L2, L3 and N) and on PE conductor – five 4 mm safety sockets for
connection to Installation Testers (e.g., PROINSTALL-200-EUR).
• Test of CP signal – two 4 mm safety sockets for connection to an oscilloscope.
• Mains socket (on backside) to connect an external load for test purposes only.
, D
) – rotary switch.
2