System Maintenance Plan - Nussbaum POWER LIFT HF 3S 5000 Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7.1
System maintenance plan
i
Before beginning service, disconnect from power. The system is to be secured against unintentional
lowering and unauthorized access.
During assembly and maintenance always check the condition of electrical lines. All cables and lines
must be secured so they cannot be crushed, kinked or contact any moving assembly.
Visual in-
Spray
spection
B
G
90
Oil
Lubricate
D
A
F
E
OPI-POWER LIFT HF 3S 5000 - HYMAX HF 3S 5000-V1.1-DE-EN-FR-ES-IT
Clean with
compressed
Clean
air
C
D
Inspect
H

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Power lift hf 3s 5000 dgPower lift hf 3s 5000 universalHymax hf 3s 5000Hymax hf 3s 5000 dgHymax hf 3s 5000 universal

Tabla de contenido