Instruction: Recirculation loop
Step
1
2
3
4
5
6
7
Instruction: Permeate outlets
Step
1
2
3
4
UniFlux 10 Instrucciones de funcionamiento 28993587 AE
Action
In the Text pane, select the Base Time instruction of the Block
PRODUCT_TRANSFER_FLOWPATH block.
In the Instruction box:
Set Breakpoint to 0.00 min.
•
In the Instructions group box, select Recirc.
•
Select Feed, set to Open, click Insert.
Select Feed_Drain, set to Closed, click Insert.
Select IntegrityTestValve, set to Closed, click Insert.
Select Retentate_Control_Valve_PCV341, set to 100 %, click Insert.
Select Retentate, set to Retentate, click Insert.
Action
In the Text pane, select the Base Time instruction of the Block
PRODUCT_TRANSFER_FLOWPATH block.
In the Instruction box:
Set Breakpoint to 0.00 min.
•
In the Instructions group box, select Permeate.
•
Select Permeate, set to Closed, click Insert.
Select Permeate_Drain, set to Closed, click Insert.
A Create a method with UNICORN 5
A.2 An example of using the Method Editor
A.2.4 Block 2: Product transfer
201