GE Uniflux 10 Instrucciones De Funcionamiento página 241

Tabla de contenido

Publicidad

Instruction: Transfer feed pump
Step
1
2
Instruction: Tank level watch
Step
1
2
End block: Allow the tank to be
filled
Step
1
UniFlux 10 Instrucciones de funcionamiento 28993587 AE
Action
In the Text Instructions tab, select the Base: SameAsMain instruction of the
Block: PROD_TRANSFER_VOLUME block.
In the Instruction Box:
Set Breakpoint to 0.00 min.
In the Instructions: list, select Recirc.
Select TransferFeedPump, set Flow to 90%, click Insert.
Action
In the Text Instructions tab, select the Base: SameAsMain instruction of the
Block: PROD_TRANSFER_VOLUME block.
In the Instruction Box:
Set Breakpoint to 0.00 min.
In the Instructions: list, select Watch and Watch.
Set:
1 Signal to Tank_Level.
2 Test to Greater_Than.
3 Value to a number in liters given by the tank specification or the
application requirements.
4 Action to End block.
Click the Insert button.
Action
In the Text Instructions tab, select the End_Block instruction of the Block:
PROD_TRANSFER_VOLUME block.
B Create a method with UNICORN 6 and above
B.2 An example of using the Method Editor
B.2.4 Phase 2: Product Transfer
241

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido