Shutting Down The Unit; Process Of Shutting Down The Unit - Ingeteam INGECON SUN 1Play TL M Serie Manual De Instalacion Y Uso

Ocultar thumbs Ver también para INGECON SUN 1Play TL M Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 109

Shutting down the unit

14. Shutting down the unit
This section describes the procedure to shut down the unit. If you wish to work inside the unit, you must carry out
these instructions in the order shown here to remove the power.

14.1. Process of shutting down the unit

1.
Proceed to stop mode from the inverter display.
2.
Remove voltage from a means of disconnection outside the unit.
3.
Wait 5 minutes, until the internal capacitors have discharged and the internal elements that may cause
burns have cooled.
4.
Check that there is no voltage at the DC and AC inputs.
5.
Signal cut-off point (Vac and Vdc) with a sign reading ¨Caution no switching...¨. If necessary, rope off the
work area.
ABE2011IQM01_C - Installation and Operation Manual
Ingeteam
DE
EN
ES
FR
IT
PT
103

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido