REPOSITION THE T-PIN
For shipping purposes, the Tower is packaged with the T-pins
installed on the inside of the Tower frame. See Figure F.
9. The T-pin should be installed on the outside of the Tower
frame for use. To remove the T-pin, push the button on the
handle of the pin while holding the push through bar (PTB)
securely. Pull the pin free of the PTB and Tower frame.
T-pin before
re-positioning
Fig F
Reinsert the pin from the outside of the Tower frame.
See Figure G.
INSTALL THE PULLEYS
10. Install the pulley assembly
as shown in Figure H. To
install the pulleys you will
need:
» 2 black knobs
» 2 pulley/spacer assemblies
» 4 plastic washers
» 2 spacers
16
T-pin after
re-positioning
Fig G
Black
Knob
Knob
Spacer
Plastic
Washer
Pully/spacer
assembly
Fig H
THREADING THE ROPES
11. Rethread the ropes.
INSTALL THE SPRING STAND-OFF ASSEMBLIES
12. Spring stand offs are used for bottom sprung push through
bar work. The spring stand offs are installed in the small holes
at the head-end of the frame. See Figure I.
Remove the Nylock nuts from the stand off assemblies.
Insert the eyebolts through the holes in the frame so the spacer
fits snugly against the outside of the frame.
Using a wrench or pliers, thread and securely tighten the Nylock
nut on the inside of the frame. See Figure I.
Spring Standoff
Fig I
INSTALL THE STANDING PLATFORM LATCH
13. It is critical to secure the Allegro standing platform when
using the mat conversion. Install the standing platform latch
kit before using the mat conversion. See separate instructions
included with latch kit.
Nylock nut
4" Eyebolt