Prepare The Bath - Alcove Installations - Kohler 7726 Serie Guia De Instalacion

Ocultar thumbs Ver también para 7726 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Verify level.
5. Prepare the Bath – Alcove Installations
Model
77261100
77271100
77281100
77301100
77311100
If a mortar cement bed was not installed, align the drain hole in the felt pad with the drain hole in
the subfloor. Secure the felt pad into place with fasteners (such as staples or nails).
Install the drain and overflow assembly to the bath according to the drain manufacturer's
instructions.
Dry fit the bath.
Verify that the bath is level. If the subfloor is not level, insert shims under the bath to adjust for
level.
Mark the height of the bath flange on each stud wall. Set the bath aside.
Measure and mark 1-9/16" (40 mm) down from the first mark.
Cut two ledger strips from 1x4 material to the length specified in dimension "G." Cut a third ledger
strip to fit the remaining width of the stud pocket.
Install the ledger strips.
Dry fit the bath again to make sure the bath is not being supported by the rim. If needed, remove
the ledger strips, slightly lower them, then reinstall.
Remove the bath.
1139487-2-F
Studs
G
Ledgers
G
30-1/4" (768 mm)
34-1/4" (870 mm)
40-1/4" (1022 mm)
34-1/4" (870 mm)
40-1/4" (1022 mm)
10
1-9/16" (40 mm)
Ledger Strip
Stud
Sterling

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

7727 serie7728 serie7730 serie7731 serieSterling 1139487-2-fSterling 7726 serie ... Mostrar todo

Tabla de contenido