Liquid
Suction
Drain
Picture 2a - Heat Exchanger Module FC5A_036
Picture 2c – Ventilation Module FC5_057 to 180
Picture 2d - Heat Exchanger Module FC5A_057 to 180
Before positioning the equipment at the site, check the following features (all models):
a.
The floor must bear the operating weight of the unit (see General Technical
Characteristics). Refer to the building structural project or applicable rules to check
the admissible load. Reinforce if necessary.
b.
Provide enough space for maintenance services. The front of the equipment shall
remain free in order to allow the air flow, and the access to the inside of the unit.
c.
In case several equipment are assembled in the same area, comply with the minimum
gaps and arrangements indicated in Picture 3.
M A N U A L D E I N S TA L A C I Ó N , O P E R A C I Ó N Y M A N T E N I M I E N T O
Dimensioning and Positioning
Picture 2b – Ventilation Module FC5_036
QUOTAS
57
72
A
500
500
B
510
510
C
1050
1050
D
325
325
E
326
326
F
x
x
G
x
x
H
54
54
I
291
291
J
27
27
QUOTAS
57
72
A
505
505
B
505
505
C
1050
1050
D
415
415
E
382
382
F
x
x
G
x
x
H
406
406
I
184
184
J
x
x
K
x
x
L
16
16
M
13
13
4.3
90
120
160
180
500
618
618
618
510
600
600
600
1350
1500
1700
1900
127
219
245
430
298
326
386
386
236
230
255
255
298
326
386
386
55
62
52
52
265
291
341
341
15
24
27
27
90
120
160
180
505
595
595
595
505
595
595
595
1350
1500
1700
1900
415
554
554
554
382
507
507
507
x
410
410
410
x
273
273
273
406
507
507
507
184
354
354
354
x
274
274
274
x
211
211
211
16
16
16
16
13
13
13
13
35