Mounting The Support Legs To Main Cabinet; Securing The Control Panel To Support Legs; Mounting The Support Panels; Securing The Support Bar - Pit Boss 3 Serie Montaje Y Operación

Ahumador vertical de pellas de madera
Ocultar thumbs Ver también para 3 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3. MOUNTING THE SUPPORT LEGS TO MAIN CABINET

Parts Required:
1
x
Main Cabinet (#7)
4
x
Support Leg With Wheel (#15)
Screw ( #B)
12 x
Installation:
Prepare the four support legs for installation, arranging the labeled legs as
shown in illustration 3A.
IMPORTANT: The four support legs must be arranged correctly to be able to
properly install the support panels and support bar in a later assembly step.
Mount one support leg to the smoke cabinet using three screws. Repeat
installation for the other three support legs. Note illustration 3B.
4. SECURING THE CONTROL BOARD TO SUPPORT LEGS
Parts Required:
2
x
Screw ( #D)
Installation:
Near the Control Board, loosen the two screws connecting the front panel
to the main cabinet. Note 4A.
Next, using another two screws, secure the front panel sides to the front-
facing support legs. Once these screws are tight, re-tighten the two screws
that were previously loosened. Note 4B.

5. MOUNTING THE SUPPORT PANELS

Parts Required:
Support Panel (#11)
2
x
8
x
Screw ( #D)
Installation:
Install one support panel to the side of the unit between a front and back
support leg. Secure using two screws on each side. Ensure the flat side of
the support plate is facing outwards. Repeat the same installation to mount
the other support panel. Note illustration for support panel arrangement.
NOTE: The support panel with two holes along the bottom should be on
the same side of the unit as the power cord exits the control board (left
side). This is important for later steps.

6. SECURING THE SUPPORT BAR

Parts Required:
Support Bar (#12)
1
x
4
x
Screw ( #D)
Installation:
Install the support bar to the rear of the unit between the two rear support
legs. Secure using two screws on each side. Ensure the support bar is placed
on the underside of the main cabinet, facing inwards. Note illustration for
support bar arrangement.
8
3A
15-1
15-2
15-4
3B
15-3
B
15-1
B
15-2
B
4
4A
These 2 Screws were
pre-assembled
D
D
5
D
11
D
11
D
6
12
D
D
15-3
15-4
B
4B
D

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

10601Pbv3pu1

Tabla de contenido