Final Assembly; Afety Instructions For Final Assembly; Assembly Of The System Components; Eschell Water Management Server - Schell eSCHELL 00 500 00 99 Manual Del Sistema

Ocultar thumbs Ver también para eSCHELL 00 500 00 99:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Final assembly

afety instructions for final assembly

6
6.1 Safety instructions for final assembly
hen connecting the e
respective installation and assembly manual for the fittings.

6.2 Assembly of the system components

6.2.1 eSCHELL water management server

he e
areas (no corrosive atmosphere). t is permanently installed in an ( P
trical distribution bo on a
»
Pay attention to good reception of the
»
e tenders

6.2.2 eSCHELL 30 V bus power supply unit

he
t is permanently installed in an ( P
top hat rail (according to D N N
t is recommended to install the e
e
ecommendation e
160
Final assembly
Danger!
Danger to life from electric current!
ouching live connections may cause serious personal injuries.
itch off the po er supply. ecure the po er supply against
>
reactivation.
Attention!
Damage to property due to wrong electrical connection!
he e
LL
ater management server is supplied
current via the e
nly connect the e
>
po er to the e
LL
ater management server may only be installed in dry indoor
ater management system
bserve the ma imum cable lengths
.
bus po er supply unit may only be installed in dry interior rooms.
LL
ater management server in the same electrical distribution bo .
LL bus po er supply unit.
LL
bus po er supply unit to supply
LL
ater management server
LL bus e tenders, also observe the notes in the
mm top hat rail (according to D N N
ireless subscribers for the e
hen choosing the installation location.
hen using the e
) electrical distribution bo on a
).
LL
bus po er supply unit and the
LL electrical distribution bo (
ith
direct
) elec-
).
LL
LL cable bus
mm
).

Publicidad

Tabla de contenido
loading

Tabla de contenido