Before Placing Tumbler Into Service - Alliance Laundry Systems DA0220SRG Instalación

220 litros de capacidad (25 libras). 270 litros de capacidad (30 libras). 350 litros de capacidad (35 libras). 300 litros de capacidad apiladas (30 libras)
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Before Placing Tumbler into Service

1. Remove or open all panels and check accessible
bolts, nuts, screws, terminals, and fittings for
tightness.
2. Replace all panels and guards.
3. Turn on electrical supply to tumbler.
4. Open the supply valve for gas or steam heated
tumblers.
5. After performing the previous checks, start the
tumbler by pressing START. (Refer to the
Operating Manual for detailed instructions.)
Release the start button and open the cylinder
door. The cylinder should stop rotating within
seven seconds after the door is opened a
maximum of 2 inches (51 mm). If it does not,
adjust the cylinder door switch. Refer to
Adjustments section.
IMPORTANT: The electronic ignition system will
attempt to light the gas by sparking for the "trial
for ignition" period (refer to Table 3). If gas does
not ignite within this period, the ignition control
will go into a safety lockout and the valve will no
longer open until the control is reset. It may be
necessary to retry several times to bleed air from
the gas lines. To reset, open and close the loading
door and restart tumbler.
Prepurge
Location
Time
(seconds)
Europe and
18
Australia
All others
1-3
Table 3
If lockout condition persists, check that the manual
gas shut-off valve is in the "ON" position and that
the gas service is properly connected. If condition
still persists, remove tumbler from service.
6. Load the cylinder with a full load of clean rags
and run to remove oil or dirt from cylinder.
70223701
Trial for
To Reset
Ignition
Lockout
(seconds)
Condition:
10
Press reset
button on rear
of machine
10
Open loading
door
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
7. Check the airflow switch operation by opening
the lint panel. The heating systems should shut
off when the lint panel is opened a maximum of
1-1/2 inches (38 mm).
The airflow switch operation may be affected by
shipping tape still in place, lack of make-up air,
or an obstruction in the exhaust duct. These
should be checked and the required corrective
action taken before attempting to adjust the
airflow switch.
WARNING
The tumbler must not be operated if the
airflow switch does not operate properly.
Faulty airflow switch operation may cause
an explosive gas mixture to collect in the
tumbler.
8. Wipe out the cylinder using an all-purpose
cleaner or detergent and water solution. Refer to
Figure 5.
Figure 5
If the tumbler does not meet ANY of the above
requirements, remove tumbler from use. Refer to
Removing Tumbler from Service section.
Installation
W072
T452I
T452I
25

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido