Ferrite Ring Installation - Alliance Laundry Systems DA0220SRG Instalación

220 litros de capacidad (25 libras). 270 litros de capacidad (30 libras). 350 litros de capacidad (35 libras). 300 litros de capacidad apiladas (30 libras)
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Electrical Requirements

Ferrite Ring Installation

Gas and Steam OPL Micro Control Models Only
The ferrite ring provided in the literature packet must
be installed over the power leads during connection of
electrical service. The ferrite protects the sensitive
electronic controls from destructive electrical
disturbances which may be present on power lines to
the machine. Failure to properly install the ferrite ring
may result in damage to the electronic controls and
will void control warranty.
1
3
1
Ferrite Ring
2
Electrical Connections V.A.C.~
3
Ground Wire
56
}
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
To Install:
1. Immediately after connection of power leads and
before applying power to machine, locate each of
the incoming service leads including ground.
2. Snap the ferrite ring closed over all of the service
leads inside of the control tray as shown. It is
important that the ferrite ring be installed inside
the control tray as shown. Do not install the
ferrite outside of the box or other area. Make sure
that service leads are in the center of the ferrite
before closing the ring so as not to pinch or
damage leads.
2
Figure 17
T383I
70223701

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido