Circuitry Overview Of Sunny Tripower Storage 60; Connecting The Inverter And Router Via Ethernet - SMA INVERTER MANAGER Instrucciones De Instalación

Ocultar thumbs Ver también para INVERTER MANAGER:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3  Inverter Manager

3.3.3 Circuitry Overview of Sunny Tripower Storage 60

igure 3:
Circuitry Overview of
Sunny Tripower Storage 60
Position
Designation
A
Battery
B
Sunny Tripower Storage 60
C
PC with LCS-Tool
D
Power analyzer UMG 604-PRO from
Janitza electronics GmbH
E
Router
SunSpec Alliance compatible weather
station (optional)
G
I/O Box (optional)
H
Inverter Manager
3.3.4 Connecting the Inverter and
Router via Ethernet
Pin assignment of network ports (LAN 1 and LAN 2):
16
IMVIOBOX-IA-xx-18
SMA Solar Technology AG
8
1
1
8
igure 4:
Pin assignment of network ports
Pin
Assignment for
10/100 Mbps
1
ETx+
2
ETx-
3
ERx+
4
---
5
---
6
ERx-
7
---
8
---
Assignment for
1,000 Mbps
TRD(0)+
TRD(0)-
TRD(1)+
TRD(2)+
TRD(2)-
TRD(1)-
TRD(3)+
TRD(3)-
Installation Manual

Publicidad

Tabla de contenido
loading

Tabla de contenido