Commissioning - SMA INVERTER MANAGER Instrucciones De Instalación

Ocultar thumbs Ver también para INVERTER MANAGER:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

SMA Solar Technology AG

5.1 Commissioning

1. Start up the LCS-Tool. The tool shows a list of all
identifed Inverter Managers. It can take
several minutes until the LCS-Tool has identifed
all Inverter Managers.
igure 11: LCS-Tool - start screen
3. Assign a password for the user group when
registering for the frst time (User and
Installer). The security status of your password
is displayed.
igure 12: LCS-Tool - checking date and time
5. In case of battery storage systems, enter the
battery details. The details under Pre-Set
Battery Limits serve as additional safety limit for
battery charging and discharging (see the
battery manufacturer's manual).
Installation Manual
2. The screen now shows a list of all Inverter
Managers. To start the assistant, click on the
Inverter Manager to be confgured.
4. Verify that date and time are correct. If not, set
date and time and continue.
IMVIOBOX-IA-xx-18
5  LCS-Tool
25

Publicidad

Tabla de contenido
loading

Tabla de contenido