5.2.13 Start and Stop
To start and stop the Inverter Manager and inverters, use the [Start] and [Stop] buttons.
igure 33: Inverter in operation (example)
igure 34: Inverter in stop mode (example)
Procedure for stopping the system:
1. Open the LCS-Tool.
2. Log in as the user group User or Installer.
3. Select the [Stop] button.
☑ The [Start] button is displayed, The Inverter
Manager and inverters are stopped.
4. Open the Status > Inverters menu and observe
the current and voltage values of the inverters.
☑ The current and voltage output of the inverters is
reduced to zero. This process can take several
minutes.
Procedure for starting the system:
1. Open the LCS-Tool.
2. Log in as the user group User or Installer.
3. Select the [Start] button.
☑ The [Stop] button is displayed, The Inverter
Manager and inverters are started.
Installation Manual
4. Open the Status > Inverters menu and observe
the current and voltage values of the inverters.
☑ The current and voltage output of the inverters
should rise to the setpoint. This process can take
several minutes.
5.2.14 Setting the Inverter Self-Test
"Q on Demand 24/7" Function
If the Q on Demand 24/7 function is enabled,
the inverter self-test must be set to a time when
there is enough PV energy available to start the
inverters. If the PV energy is not high enough to
start the inverters, no self-test will take place.
Tip: If the Q on Demand 24/7 function is
enabled, set the time of the self-test so that the
inverter self-test occurs during the day.
You can choose any time for the inverter self-test.
1. Open the LCS-Tool.
2. Log in as the user group Installer.
3. Select the Setup > Date and Time menu.
4. Enable the option button Selftest On/Off.
5. Set the desired time for the self-test.