Routing The Cable Assembly; Routing The Cable On The Weight Tower - Precor Discovery Selectorized Serie Manual Del Propietário

Tabla de contenido

Publicidad

Routing the Cable Assembly

The cable is wrapped in packing material and attached to the equipment frame
for shipment. Proper cable routing is shown in the following figure.
Figure 8: Correct cable routing on equipment
If necessary, use the following procedure to restore the cable to its original
route.
To route the cable on the movement frame:
1. Remove the pulley covers using a #2 Phillips bit.
2. Route the cable around the pulleys as shown in the preceding figure.
3. Reattach the pulley cover and screw removed in step 1 and tighten to 10
in-lb (1 N-m) of torque.
Leg Press Assembly Guide: Routing the Cable Assembly

Routing the Cable on the Weight Tower

The weight tower ships with the kick cover and pulley cover attached.
To route the cable on the weight tower:
1. Using a ⁵ ₃₂-inch hex bit, remove the screw and pulley cover and set them
aside.
Figure 9: Kick plate pulley cover removal
7

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido