Power Connection
Nominal
V DC
R
K4
1 2 3
Connect protective earth wire to terminal provided in housing and marked with
Functionality Tests - CLS200
To test the basic functionality of the probe and potentiometers:
switches shown in
OFF position
O
1 2 3 4 5
F
F
/ROCKER DOWN
Preparation
1.
Ensure the green power LED L3 is on.
2.
Set DIP switches S1 to S4 OFF (rocker down as shown in diagram above).
3.
Set DIP switch S5 ON (rocker up, opposite to diagram above).
4.
Turn the delay potentiometer P1 fully counter-clockwise.
5.
If the yellow sensor status LED L1 is not on, turn the trip-point potentiometer P2
counter-clockwise until it just turns on.
6.
Turn the trip-point potentiometer P2 clockwise until LED L1 just turns off.
7.
Set DIP switch S5 OFF (rocker down as shown in diagram above).
7ML19985JH04
Pointek CLS200/300 Standard – OPERATING INSTRUCTIONS
24 V DC
22 to 26 V
120 Ω
12 to 250 V AC/DC
switch bank
P1
delay
L2
output
status
(red)
48 V DC
46 to 50 V
234 Ω
P2
trip point
L3
L1
sensor
power
status
(green)
(yellow)
Page 25