Preparation Before Taking A Measurement; Battery Installation / Replacement - Medline MDS1001U Guía De Operación

Monitor automático de brazo con manguito para presión arterial, esfigmomanómetro electrónico
Ocultar thumbs Ver también para MDS1001U:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION BEFORE TAKING A MEASUREMENT

Battery Installation / Replacement

1. Slide the battery cover off in the direction of the arrow.
2. Install or replace the four alkaline "AA" batteries, noting
the proper orientation of positive (+) and negative
(-) terminals of the batteries in the battery
compartment.
3. Replace the battery cover.
4. If the Low Battery Symbol appears on the display,
replace all batteries with new ones.
5. Remove the batteries if the device will not be used for
an extended period of time.
Note
Batteries are hazardous waste.
Do not dispose of them with household garbage.
-13-

Publicidad

Tabla de contenido
loading

Tabla de contenido