Atlas Copco HYDRAULIC PAC 30 Instrucciones Para El Operario página 7

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 23
Note: Atlas Copco hydraulic powerpacks is clearly
marked with E.H.T.M.A. category. It is important that
any tool used with the powerpack is of a compatible
category, if in any doubt consult your Atlas Copco
dealer.
Hose length
1 Normally 7 metres of siamesed hoses is to be
used for the Hydraulic Pac 30.
2 In normal temperatures (0–40
hose length should not exceed 25 metres.
Service schedules
A poorly maintained machine is a hazard. Doing
regular maintenance and lubrication jobs listed in
these schedules will help keep the machine in safe
working order.
Apart from the daily jobs, the schedules are based
on machine running hours. Keep a regular check of
hours in use. Do not use a machine which is due for
a regular service. Rectify any defects found during
regular maintenance before clearing the machine
for use.
!
WARNING
Maintenance must be done only by suitably
qualified and competent persons.
Before doing any maintenance, make sure
the machine is safe and correctly sited on
level ground.
Daily
Clean
1 Machine generally.
Check
2 Generally for damage.
3 Hydraulic fluid level.
4 Engine oil level.
5 Hydraulic couplings.
6 Hydraulic hoses.
Note: Check tightness of nuts, bolts, screws
and hose fittings after the first days operation and
thereafter in accordance with Maintenance
Schedules.
Note: The engine oil should be replaced after
the first three days operation and thereafter in
accordance with the Maintenance Schedules.
Every 3 months
1 Do the Daily jobs plus:
Clean
2 Air cleaner elements. (See Engine
Change every 300h or every year.
1 Engine oil.
2 Hydraulic filter.
o
C) the maximum
3 Hydraulic oil.
Manufacturer's Handbook.)
English
7

Publicidad

Tabla de contenido
loading

Tabla de contenido