Table 1
Torque
DN10
DN15
DN20
DN25
DN32
DN40
DN50
6
Putting into service
Putting a system into service may only be performed by qualified persons. All operating
instructions must be read and followed before putting into service for the first time. In
addition, it must be checked that the installation work was performed correctly.
WARNING: The pipe system must be vented, as air bubbles can lead to explosions if
pressure is suddenly built up. Therefore, the operating pressure should be built up in
stages.
Application errors can result in danger to life due to parts that come loose!
Assembly and maintenance instructions - 2140 / 2180
Cylinder head
screw
M8
M8
M10
M10
M12
M12
M10
Tightening sequence
2140 (Nm)
34
34
55
55
75
75
55
www.goetze-armaturen.de
2180 (Nm)
22
22
43
43
46
56
52