11 4.3 Finishing Of The Opening - Vetus STE9524D Instrucciones De Instalación

Ocultar thumbs Ver también para STE9524D:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 89
To draw the opening a template is required.
A template is not provided, but you can eas-
ily create one yourself using a piece of waste
sheet material or sturdy cardboard.
• Draw the opening to be sawn out.
• Saw the opening in the hull.
Preferably saw at an angle of 45° in relation to
the ship's centre line.
After the bow thruster has been fitted, the
sawn-out section can be used as a hatch to
close the opening while sailing.
4 .3
Finishing of the opening
• Finish the sawn-out section of the hull so
that it fits properly into the opening in the
hull.
Due to the angle the hatch has been sawn
out (45°) the hatch fully closes the opening
once the bow thruster is retracted.
vetus® Installation instructions Retractable Thrusters
Tunnel tube diameter
Bow thruster
[mm]
35 kgf /
55 kgf
ø150
60 kgf / 75 kgf / 95 kgf
ø185
125 kgf / 160 kgf
ø250
Hull
Template
Hull
W
L
Template
W
[in]
[mm]
[in]
6
224
8
3
7
5
/
254
10
16
10
384
15
1
45°
ENGLISH
L
[mm]
[in]
/
285
11
1
/
4
4
322
12
5
/
8
/
450
17
3
/
8
4
31
020584.01

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ste5512dSte6012dSte5524d

Tabla de contenido