Configuring The Panels; Test Run - Vetus STE9524D Instrucciones De Instalación

Ocultar thumbs Ver también para STE9524D:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 89
7 .4

Configuring the panels

If several panels are installed configuration is
required.
The illustrated operations must be per-
formed on EACH panel installed .
Note:
During operation '2' the button marked
with '1' must be keep pressed while the On /
Off button is pressed 2 times!
Configuring a panel for bow thruster or stern thruster
1
2
Configuring a panel for helm station
1
2
With a bow and stern thruster panel,
together at the same helm station, the
helm station number entered must be
the same .
8

Test run

• Turn on the main switch.
• Press the on/off button on the panel twice.
After pressing the button twice, the bow thruster should rotate outward.
If it is found during test running that the thrust direction does not correspond with the direc-
tion switch on the control panel then the brown (no. 3) and the green (no. 4) wires on the relay
must be interchanged.
Do NOT test the bow thruster while the ship is out of water, unless you are certain that
everyone is at a safe distance from the thrust tube.
Never allow the bow thruster to run for longer than 5 seconds with the ship out of water.
46
020584.01
Configuration operations
with a joystick panel
4
3
2 x
4
3
2 x
1
n
ote
W
!
arninG
BLUE
OR
1 x
OR
Helm station
2
3
4
1 BLUE, ashing
2 RED, ashing
3 BLUE, ashing
RED, quick ashing
4 BLUE and RED,
simultaneously ashing
vetus® Installation instructions Retractable Thrusters
=
5
RED
1 x
5
Helm station
1
2
3
4
3
=
1 x
1 x
4
3
4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ste5512dSte6012dSte5524d

Tabla de contenido