5.7 Setting up the device for three-phase
operation
Phase sequence relay
For versions Professional(+) 7,4 / 22 (PnC) only.
To operate the device in single-phase the potentiometer
at the phase sequence relay must be changed over.
L3 X
L2 X
L1 X
SOR74
1
3
1
N X
X 16
15 18
f Connect the device to single phase.
Î "5.6.1 Power supply"
f Adjust potentiometer (1) to position 1 using a slotted
screwdriver.
Setting
1
3
Web interface
To operate the device on a single phase, it is necessary to
change a parameter in the web interface.
Î "6 Commissioning"
f Navigate to the "Operator" menu and set the following
parameter:
Parameters
Phases connected to
the ChargePoint
Description
Single-phase operation
Three-phase operation
Setting
f Select "Single-phase sys-
tem".

6 Commissioning

The activities described in this section must only
be executed by a qualified electrician.
Connections
1
2
Fig. 14: Connections for the configuration on the ECU
Pos.
Use
1
Slot for a SIM card
2
Configuration of the device
6.1

Setting up a connection to the ECU

With an existing configuration the device can be confi-
gured and status information can be called-up.
f Connect end device (e. g. PC, laptop, mobile phone)
und ECU with the provided USB cable. To do this use
the micro-USB connection (2) of the ECU.
Î "Fig. 14: Connections for the configuration on the ECU"
EN
Connection
Micro-SIM
Micro-USB
17

Publicidad

Tabla de contenido
loading

Tabla de contenido