Mennekes AMTRON Serie Manual De Instrucciones página 71

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 83
Block 12: Other
Parameter
HLC 15118 configuration
Use of SA Schedule in
15118 HLC
Extra HLC 15118 logging
Power source voltage
Phases connected to
the ChargePoint
Phase rotation of the
ChargePoint
Tilt detection
Randomise charging
after power loss
Language of Display
UTC time for housekee-
ping reboot
Vehicle connection
timeout
Lock Actuator only if
authorized
Permanently locked
cable
Temperature Report
Delta
RCMB Delta
Energy management
from second meter
Current limit for ener-
gy management from
second meter
Energy management
from external input
Current limit for ener-
gy management from
external input
Operator Password
Description
Enables communication in accordance with ISO 15118
Allows the forwarding of load profiles to the vehicle which
are set by the operator via the Smart Charging Profile
(Secondary Actor) for the charging point.
Used to activate the recording of the input and output
streams of ISO 15118 communication. The log is stored in
the hlc_log.csv file
Rated voltage between phase conductor and neutral con-
ductor
Number of phases connected on the device
Direction of rotation of the phases L1, L2 and L3
Setting of tilt detection
Random delay after power failure to avoid peak currents
Time for restart of the device
Time that is allowed to elapse between an authorization
and connection of the vehicle to the device, in order to
start a charging process
Locking of the charging plug only after authorization
Permanent locking of the charging plug
Temperature change (in °C), that is necessary in order to
send a temperature report to the Backend-System
Differential current change (in 0.1 mA) that is necessary
for sending an OCPP status notification to the Backend-
System
Energy management using an external meter
Current limit (in A) for energy management using an exter-
nal meter
External management using an external switching contact
Current limit (in A) for energy management using an exter-
nal switching contact
Password for the web interface
Not relevant for the device
Necessary
Remark
for ...
For
Professional+ 7.4
ISO 15118
/ 22 PnC versi-
ons only
Charging
Only relevant
system
for three-phase
operation
A restart will be
performed every
30 days
Charging
system
Backend-
System
Charging
system
EN
29

Publicidad

Tabla de contenido
loading

Tabla de contenido