Installation; General; Preparation - De Dietrich INIDENS 24 Manual De Instalación Y Mantenimiento

Ocultar thumbs Ver también para INIDENS 24:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 210
Danger
The packaging items (plastic bags, polystyrene etc.) must not be kept within the reach of children as they are a
potential source of danger.
Fig.105
1
6
6

Installation

6.1

General

Installation must be carried out in accordance with the prevailing regulations, codes of practice and the recommendations in this
manual.
6.2

Preparation

Once the exact location of the boiler has been determined, fasten the template to the wall.
Install the product, starting from the position of the hydraulic and gas connections. Make sure that the rear part of the boiler
(back) is as parallel to the wall as possible (otherwise, increase the thickness of the smaller area). In the case of pre-existing
systems and if replacing them, in addition to the aforementioned, it is recommended to provide a magnetic filter, on the boiler
return, to collect any deposits and debris, even those that may be present after washing the system and that over time could be
put into circulation.
Once the boiler is fastened to the wall, connect the exhaust and intake pipes. Connect the siphon to a drainage well, ensuring a
continuous slope. Horizontal sections must be avoided.
7804841 - 02 - 20012022
2
3
7
8
4
5
9
10
b
LIFT
a
LIFT
en
6 Installation
BO-0000071
INIDENS
165

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Inidens 20/24 miInidens 24/28 miInidens 30/35 mi

Tabla de contenido