Mounting and installation instructions
5.5
Installation in the control cabinet
Information
● When placing the KC-M20 unhindered access to existing control cabinet
● The SIM card may need to be installed before the mounting is done.
The KC-M20 can be mounted on a top hat rail. The mounting package in-
cludes two brackets (one has a shorter depth) and a mounting clip.
Information
The screw holes in the KC-M20 for the mounting package are symmetric.
The mounting package can be mounted on any side of the KC-M20.
Required materials and tools (included in the scope of delivery):
●
●
Proceed as follows to mount the KC-M20 on the top hat rail:
1) Unscrew the M4 screws on the side of the housing.
2) Secure the short bracket (2) on the KC-M20 with two M4 screws (max.
Fig. 5-14: Mounting brackets
3) Secure the long bracket (1) on the KC-M20 with two M4 screws (on the
266
components must be maintained.
Otherwise, installation is no longer possible.
3x M3 screws, 5 mm length
Phillips screwdriver
torque of 0.59 Nm, tolerance ±0.05 Nm).
opposite side of the short bracket). The long bracket must be above the
short bracket.
M20
Configuration manual V1.01
© KEBA 2022