Descargar Imprimir esta página

Casselin CFRPG430 Manual De Instrucciones página 47

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 94
FACILITY
ESTABLISHMENT
ALL OVEN INSTALLATION OPERATIONS (SETTING UP, ELECTRICAL
CONNECTION, GAS CONNECTION AND EXTRACTION CONNECTION,
ADJUSTMENTS AND CHECKS) MUST BE CARRIED OUT MANDATORY
AND EXCLUSIVELY BY QUALIFIED PERSONNEL IN ABSOLUTE
COMPLIANCE WITH THE LAWS IN FORCE IN THE THE COUNTRY OF
USE.
THE OVEN MUST BE INSTALLED IN A TECHNICAL ROOM WITH
ADEQUATE VENTILATION, VENTILATION, GAS SUPPLY AND
COOKING FUME ELIMINATION SYSTEMS; THE VOLUMETRY OF THE
TECHNICAL ROOM IS REGULATED AND MUST BE SUFFICIENT TO
LEAVE THE WORKING ENVIRONMENTS HEALTHY
The positioning of the oven must respect the minimum distances (mm.) indicated in fig.5. It must
rest on a suitable support to support it.
It is advisable to leave the right part of the oven free to facilitate the dismantling of the panel
higher and for maintenance.
Front view
Side view (fianco destro)
FIG.5
12

Publicidad

loading

Este manual también es adecuado para:

Cfrpg630Cfrpg930