B
a.
Snap on* the current sensor to the PHASE cable (L) or NEUTRAL
cable (N) at the exit from the meter.
b.
Connect to cables of an appropriate length (we advise twisted and
with a section of 0.5 mm
c.
Put the cables into the cable gland (B).
d.
Connect the cables to the J7 'push-in' spring clamps (6) without using
tools. There are no particular requirements for the position of the
wiring on the terminal.
*
the sensor is fitted with a clamping system which enables installation
without disconnecting the power supply cable.
2
).
A = 25.5 mm
B = 10.2 mm
C = 40 mm
D = 5.91 mm
E = 26.5 mm
F = 6.1 mm
6
35