P
R
R
18
Operation Technical Manual
P
7.
8.
R
S
9.
V
T
10.
S
Remove the 4 bolts (P) and remove the
bearing assembly (R).
Remove the bearing (R) of the box.
Remove the two pins (S) and remove the
shaft (T).
Replace the minor shaft (T) by the major shaft
(V) supplied with the platform.