The appliance can be handled using fork-lift or
hook equipment of suitable load-carrying capaci-
ty. Before lifting, check the position of the load's
centre of gravity.
Important
When engaging with the lifting equipment,
watch out for the intake and outlet pipes.
All installation stages must be considered right
from production of the general layout.
Before starting these stages, as well as deciding
the place of installation, if necessary, the person
authorised to carry out these operations must
organise a "safety plan" to protect the people di-
rectly involved, and he must also ensure strict
compliance with all legal requirements, especially
those relating to mobile work-sites.
The place of installation must have all the connec-
tions needed to supply the appliance and dispo-
se of the production residues, must be suitably lit
and must meet all legal health and hygiene requi-
rements to prevent the contamination of the fo-
ods.
If necessary, fi x the exact position of each indivi-
dual appliance or subassembly by mark coordina-
GB
tes to locate them correctly. (see explanatory dia-
gram).
Important
The room where the appliance is installed must
have air inlets to ensure that the appliance can
operate correctly and provide the necessary
air exchange in the room itself.
Important
The air inlets must be of appropriate size and
must be protected by gratings and placed so
that they cannot be obstructed.
_inst_GB
HANDLING AND LIFTING
INSTALLATION OF THE APPLIANCE
ROOM VENTILATION
- -
Install in accordance with the relevant legislation,
regulations and specifi cations in the country of
use.
ENGLISH