Descargar Imprimir esta página

Angelo Po 1N1BR2G Manual De Uso página 110

Sartén de gas

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

To carry out this operation, proceed as follows.
Remove the knob (B).
)
Undo the screws (C) and remove the control
)
panel (D).
Back off the screws (E).
)
Move the component (F):
)
– clockwise to block gas and movement in ad-
vance.
– anticlockwise to delay blocking gas and move-
ment.
Raise and lower the tank to ensure that the ad-
)
justment is correct; the tank must be level. If
not, repeat point 4.
Tighten the screws (F) .
)
Replace the control panel (D) and the knob (B)
)
on completion of the operation.
Switch on the appliance and check that it op-
)
erates correctly (the temperature light must be
on).
To carry out this operation, proceed as follows.
Fit the spanner (A) onto the hexagon (B).
)
Keep a fi rm grip on the spanner (A) and undo
)
the locking screw (C).
Turn the key (A) clockwise to load the spring
)
GB
or anticlockwise to unload it (on the left side)
and anticlockwise to load or clockwise to un-
load it (right side).
C
B
_inst_GB
ADJUSTING THE WELL MICROSWITCH
ADJUSTING THE LID COUNTER BALANCING
A
B
C
F
Once the correct balance is obtained, screw in
)
the screws (C) without tightening them fully.
Use the spanner (A) to turn the shaft until it is
)
located in one of the seats provided.
Fully tighten the screws (C).
)
-
-
A
D
C
E
E
C
B
A
ENGLISH

Publicidad

loading

Este manual también es adecuado para:

1n1br3g2n1br2g2n1br3g1t1br2g1t1br3g2t1br2g ... Mostrar todo