Descargar Imprimir esta página

EMERYMARK EMP 200 Manual De Operación página 44

Ocultar thumbs Ver también para EMP 200:

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation Manual EMP
1.2.2.1 Guide for connecting the cooling tower
1. Make sure you have the corresponding electrical installation for the cooling tower 220v two
phases and a physical ground with an independent 10AMPS thermal tablet and also have the
electrical connection of your machine ready depending on the model (see chart 1.2.1 in Pg 42).
2. Make sure you have all the material ready to install, the machine does not include hoses,
pipes or any material suitable for installation. We recommend installing your machine with:
•Heavy duty braided hose
•CPVC pipe
•Copper tubing
•Fusion blue pipe (only if it exists in your country)
3. Locate the entrances and exits of the machine to be
installed and the cooling tower.
5. Connect the water inlet of the machine to the
water outlet of the tower (the pump).
6. Turn on your cooling tower from the tablet and verify its operation.
7. See page 51 to power on your equipment properly.
WARNING:
!
All installation that is carried out must comply with local standards for water and
electricity
44
4. Connect the water outlet of the machine to the
water inlet of the tower.
www.emerymark.com

Publicidad

loading

Productos relacionados para EMERYMARK EMP 200

Este manual también es adecuado para:

Emp 500Emp 1500Emp 3000