2.1 Control panel
EMP-200
EMP-500
EMP-1500
REFRIGD
1
2
3
1. Pump switch.
2. Compressor switch.
power on equipment
Turn on the equipment with the main switch, then the pump turns on, then the compressor.
When finished using the equipment, first the compressor is turned off, then the pump and fina-
lly the main switch.
!
WARNING:
The compressor must not be turned on without first turning on the pump.
2. Operation
EFROST
SET
EMP 3000
4
3. Main switch.
4. (EMP-3000 only) Piston knob for mold
travel.
BOMBA
COMPRESOR
PISTÓN
51