WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-leveling device is working properly.
•
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUP
•
•
Let group dispense water for about a minute.
HOT WATER
•
Continuously dispense hot water (using the appropriate device) until at least 1 liter of water have been used (See
STEAM (also with Quicksteam)
•
Dispense steam from the nozzle for about a minute, using the appropriate device.
5. Installation Check-up