en
38 | SBM V85 A | Commissioning
4.
Commissioning
4.1
Unpacking
1. Remove the steel bands and fasteners.
2. Carefully lift off the packaging.
3. Remove the accessories and packaging material
from the packaging unit.
i
Check that the SBM V85 A and the accessories
are in proper working order and that there are
no visible signs of component damage. In case of
doubt, do not start up the unit and consult customer
service.
i
Remove the accessories and packaging material
from the packaging unit.
4.2
Setting up
1. Unscrew the screws that secure the SBM V85 A to
the pallet.
WARNING – Defective or incorrectly
attached lifting straps!
Risk of injury due to SBM V85 A falling
down.
¶
Check lifting straps for physical damage
before attaching.
¶
Tighten lifting straps uniformly.
¶
Lift SBM V85 A carefully.
2. Attach slings of the same length and sufficient load
bearing capacity (min. 100 kg) as shown in the drawing.
|
1 695 600 571
2016-08-23
3. Hoist the SBM V85 A with a crane. Erect in the
intended area, taking care to comply with the
specified minimum distances.
500 mm
i
To ensure reliable, ergonomic use of the
SBM V85 A, we advise setting it up at a distance
of 500 mm from the nearest wall.
4. Secure the SBM V85 A to at least 3 points on the
floor.
651120-19_BM
SICAM srl soc. Unip