i
A two-pole residual-current-operated circuit breaker
of type "C" must always be used to provide fuse
protection for the mains connection. Single-pole
circuit breakers are not permissible.
i
The temperature and ambient conditions specified
in the Technical Data must be observed for
operation.
2
3
1
Fig. 10:
Power cord connection - Back of SBM V85 A
1 On/off switch
2 Mains connection
3 Power cord
SICAM srl soc. Unip
Commissioning | SBM V85 A | 41
4.7
Checking the direction of rotation
1. Check that the SBM V85 A is correctly connected
to the mains power supply.
2. Switch on the SBM V85 A with the On/Off switch.
3. Close the wheel guard or press the < I > button).
The shaft rotates.
4. Check the direction of rotation of the shaft.
i
The correct direction of rotation is indicated by a
yellow arrow on the SBM V85 A. This arrow is
situated to the right of the flange.
i
If the direction of rotation is incorrect, the SBM V85 A
comes to an immediate stop and displays the error
message "3" (see section Faults).
4.8
Calibration of SBM V85 A
!
Calibration must be performed after initial
commissioning.
1. Flange calibration.
2. Vernier caliper calibration.
3. SBM V85 A calibration.
4. Perform reference measurement.
i
Calibration is described in Section "Calibration".
i
For the calibration of the rim-width gauge refer to
the corresponding manual.