Descargar Imprimir esta página

GE DPVH890 Manual Del Propietario E Instalación página 30

Profile secadoras
Ocultar thumbs Ver también para DPVH890:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
EXHAUSTING THE DRYER (cont.)
BOTTOM VENTING (cont.}
ADDING
A NEW DUCT
Reconnect the cut
portion A of the
duct to the blower
housing,
Tape the elbow
in a 90-degree
position to
prevent rotation.
Insert the elbow
through the rear hole
and connect
it to
portion A. Rotate
the elbow through
the bottom opening.
Portion"A"
Fixinghole
Rearhole
Bottom
opening
While holding down
the pipe and elbow, using
your hand through the rear
opening, drill a 1/8" hole
through the bottom tab
hole and the pipe as
shown in the illustration.
Bottomview
NOTE: Make sure the hole is drilled all the wag
through
the elbow and pipe.
CAUTION:
Be sure not to pullor damage
the electrical
wires inside the drger when
inserting
the duct.
While still holding down
the pipe and elbow from
the rear opening, screw
the pipes in place with
the previously
saved screw.
Apply duct tape
Ducttape
as shown on the joint
_
_<"
between the drger internal
duct and the elbow.
NOTE: Make sure the tape
covers the screw hole in
portion A where it connects
to the elbow.
CAUTION: Internal duct
joints
must be
secured with tape; otherwise,
theg mag separate
and cause a safetg hazard.
Dr£1er Exhaust to the bottom of cabinet
for Gas and Electric models.
ADDING
COVER PLATE TO REAR OF CABINET
(BOTTOM
EXHAUST)
Connect standard
metal elbows and ducts to
complete
the exhaust sgstem. Cover back opening
with a plate (Kit WE1M454) available from gour
local service provider. Place drger in final location.
WARNING - NEVER LEAVE
THE BACK OPENING WITHOUT
THE PLATE.
(Kit WEIM454)
3O

Publicidad

loading

Este manual también es adecuado para:

Upvh890