Descargar Imprimir esta página

GE DPVH890 Manual Del Propietario E Instalación página 31

Profile secadoras
Ocultar thumbs Ver también para DPVH890:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
FINAL SETUP
[]
LEVEL THE DRYER
Stand the dryer upright near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front
to rear.
Raise
Lower
[_[] ATTACH SERIAL CABLE
Attach the serial cable for washer and dryer
connection
to the serial port on the back of
the dryer.
Attach the other end of the cable to the washer
before pushing the washer into its final position.
SerialPort
Rearof
Dryer
r_ PLUG DRYER IN
'_!_,Ensure
proper
z-'__:::_I _
I "ground exists
L__J
before use.
[_] GROUNDING
INSTRUCTIONS
This appliance
must be grounded.
In the event
of malfunction
or breakdown,
grounding
will
reduce the risk of electric shock by providing
U path of least resistance for electric current.
This appliance
is equipped with U cord having on
equipment-grounding
conductor
and a grounding
plug. The plug must be plugged into an appropriate
outlet that is properly
installed and grounded
in
accordance
with all local codes and ordinances.
r_ DRYER STARTUP
Press the POWER button.
POWER
NOTE: If the dryer has been exposed to
temperatures
below freezing for an extended
period of time, allow it to warm up before pressing
POWER. Otherwise, the display will not come on.
The dryer is now ready for use.
SERVICING
-A WARNING - Label all w ires
prior
to disconnection
when servicing
controls.
Wiring
errors can
cause
improper
and
dangerous
operation
after
servicing/installation.
For replacement
parts and other information,
refer to the buck cover for servicing
phone
numbers.
31

Publicidad

loading

Este manual también es adecuado para:

Upvh890