Descargar Imprimir esta página

Angelo Po 0N1FR1ED Manual De Uso página 157

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

HANDLING AND INSTALLATION
CONVERSION OF ELECTRICITY SUPPLY (0*1FR5ED - 1*1FR6ED)
NOTE: The appliance is supplied at an
operating voltage 400V/3N (indicated on
the sticker applied to the dataplate); conver-
sion to 230V/3 can be carried out as descri-
bed below.
HAZARD: Before doing any work, turn
off the general power supply.
Pull off the knob (B).
1)
Undo the screws (C) remove the control panel
2)
(D).
Fit the jumper (E) to make the electrical con-
3)
nection of the terminals (F).
Change the connections of the terminal bo-
4)
ard (G) as shown in the diagram.
Replace the lid (D) and fi x it with the screws
5)
(C) on completion of the operation.
Close the hatch (B).
6)
Remove the test voltage indicator sticker from
7)
the dataplate and apply the new one to iden-
tify the voltage being used.
NOTE: After completing the opera-
tion, check for any faults.
WARNING: Before commissioning the
appliance, the system must be tested to as-
sess the operating conditions of every sin-
gle component and detect any anomalies.
At this stage, it is important to check that all
health and safety requirements are strictly
adhered to.
The following checks should be carried out to
test the system:
Check that the mains voltage is the same as
1)
that of the appliance.
3301300_inst_GB_rev.2
TESTING OF THE APPLIANCE
To test the system, make the following checks:
1)
2)
3)
After testing, if necessary instruct the user in
all the skills necessary for putting the appli-
ance into operation in conditions of safety, in
accordance with legal requirements.
B
G
400V/3N
G
230V/3
Check that the mains voltage is the same as
that of the appliance.
Operate the appliance's circuit-breaker to
check the electrical connection.
Check that the safety device is operating
correctly.
ENGLISH
C
D
E
F
11

Publicidad

loading

Este manual también es adecuado para:

0t1fr1ed0n1fr5ed0t1fr5ed1n1fr2ed1t1fr2ed1n1fr6ed